Advertisements

Tagged: Thumb Loop

ThumbWind Archive 0

Google-backed Wind Power Line Clears Hurdle

From 2012- The Chicago Tribune is reporting that a proposed Atlantic Wind Connection (AWC) line has passed its first regulatory hurdle.

Advertisements
ThumbWind Archive 4

DTE Energy to Build 70 Wind Turbines in Huron County Michigan

April 19, 2012 – DTE Energy announced today that it plans to build its next wind park in Huron County, which will add another 110 megawatts (MW) to the company’s renewable energy portfolio.

ThumbWind Archive 1

In 2012 Senate Rejected Stabenow’s Tax Credit Extension for Wind Power

From 2012 – The United States Senate voted down an amendment to the Surface Transportation Bill in 2012 that would have given a one-year extension to the Production Tax Credit (PTC) for wind power.

ThumbWind Archive 4

Construction of Thumb Loop Transmission Line

The Thumb Loop project will be the base of transmission system designed to meet the identified maximum wind energy potential of the Thumb region.

%d bloggers like this: